September 2015
A printing customer of ours based in Feltham Middlesex, who deals with very large image files was suffering from extended timescales to transfer data around the factory.
The solution required was to install high speed OM3 Multimode fibre optic cables between the Main comms cainets on site and provide 10 Gigabit capable network links.
Read more
| Sep 15, 2015
Posted by Simon
Structured copper and fibre optic cabling installation in a factory Slough area
Read more
| Apr 29, 2015
Posted by TimL
The IT manager of a secondary school in Middlesex had a requirement to move an existing IT rack. The schools current project was to build a new multimedia production suite but the existing floor standing IT rack was in the way of the planned works.
Read more
| Mar 05, 2015
Posted by TimL
Flair PLC have undergone a major office refurbishment in recent months and an integral part of this was the structured office cabling.
Read more
| Mar 05, 2015